A simulation study was carried out by OPC to maximise the value of a large producing oil field in Central Africa.
Production history was used to constrain uncertain subsurface parameters, using T-Navigator uncertainty workflows. OPC delivered a range of history matched models, which were used to evaluate infill well opportunities under a number of reservoir scenarios.
The work was performed by OPC specialists in London and Houston and they closely co-ordinated with technical staff at both operator and asset owner companies.